Bulletin Board Post

Road Closure Hwy 167

Hwy 167 (Holy Hill Rd.) from Hwy 175 to Hwy 164 will be closed for resurfacing starting Monday July 11, 2022.  For those coming to DBCL from the east, possible alternative routes include County Hwy Q (County Line Rd) to the south, or Pioneer Rd. to the north.

Information from the Wisconsing DOT website:

PROJECT OVERVIEW
The purpose of the project is to address the deteriorating pavement condition and extend the service life of WIS 167.  The last highway rehabilitation project covering this 3.5-mile segment of WIS 167 occurred in 1997, which consisted of resurfacing and reconstruction of areas throughout the project limits.  The anticipated work of this upcoming proposed resurfacing project includes:
- Pavement base patching
- Asphaltic milling and resurfacing to place a new layer of asphalt on the roadway
- Guardrail replacement and slope grading in guardrail areas
- Potential minor culvert repairs

TRAFFIC IMPACTS
During construction, WIS 167 is anticipated to be closed to through traffic utilizing a detour route. The roadway will remain open to businesses and residents.

SCHEDULE
Mid-July to Early September 2022

Last updated: 07/15/2022